Panini, a popular sandwich shop, offers 3 types of sandwiches: Grill vegetables,
ID: 376863 • Letter: P
Question
Panini, a popular sandwich shop, offers 3 types of sandwiches: Grill vegetables, grilled chicken and pastrami. The table below provides demand data:
Grilled Vegetables
Grilled Chicken
Pastrami
Demand per hour
25
50
10
There are up to five steps in the process of making sandwiches, listed below with activity times. Only 50% of customers want their sandwich toasted, no matter which sandwich is ordered.
Step
Grilled Vegetables
Grilled Chicken
Pastrami
Cut bread
.75 minutes
.75 minutes
.75 minutes
Grill
1.4 minutes
1.4 minutes
-
Slice meat
-
-
3 minutes
Toast
2 minutes
2 minutes
2 minutes
Wrap
.5 minutes
.5 minutes
.5 minutes
Suppose Panini employs 1 worker at each step. What is the implied utilization of the bottleneck of this process?
Please include an explanation.
Grilled Vegetables
Grilled Chicken
Pastrami
Demand per hour
25
50
10
Explanation / Answer
Total demand for sandwiches = 85
Considering the workload at each step in number of minutes for the sandwich making process -
Step 1 - Cut bread
Workload = 0.75*85 = 63.75 minutes
Utlization = 63.75/60 = 1.06
Step 2 - Grill
Workload = 1.4*75 = 105 minutes (as pastrami doesn't require to go through this step)
Utilization = 105/60 = 1.75
Step 3 - Slice meat
Workload = 3*10 = 30 minutes (only Pastrami requires this step)
Utlization = 30/60 = 0.5
Step 4 - Toast
Workload = 2*0.5*85 = 85 minutes (only 50% customers require the sandwiches to be toasted)
Utilization = 85/60 = 1.42
Step 5 - Wrap
Workload = 0.5*85 = 42.5 minutes
Utilization = 42.5/60 = 0.71
Hence, highest utilization of bottleneck is 1.75