17. (2 Points) Lean production is difficult to implement when a. demand is highl

ID: 380839 • Letter: 1

Question

17. (2 Points) Lean production is difficult to implement when a. demand is highly variable. b. product variety is high. c. there are many unique products. d. all of these choices 18. (2 Points) The method of linear programming can be used to allocate workers to different jobs. a. Genetic b. Differentiation c. Assignment d. Transportation 19. (2 Points) In the manufacturing firm, is (are) considered as inventory. a. material and part (input inventory) b. Work-in-process inventory c. finished good (output inventory) d. all of the above 20. (2 Points) Typically, yield management (revenue management) techniques are widely used except a. Hotel industry b. Airline industry c. Stadium and Theater d Gas, water, and electricity 21. (3 Points) The ( ) effecet could occur when slight demand variability is magnified as information moves ( (a) upstream (b) downstream) partner.

Explanation / Answer

17. D. Lean is difficult to implement because demand is variable, wide range of unique

18.D. Transportation is used for allocating resources in optimal way.

19.D. all three are considered inventory because it holds up the capital.

20.D. basic utilities still do not use yield management.