ne manuracturing of & ClOCk iS Comprised Of SX Steps.Bach Step Is Starred by one

ID: 384764 • Letter: N

Question

ne manuracturing of & ClOCk iS Comprised Of SX Steps.Bach Step Is Starred by one Worke he tabile shows the tasks peformed by cach worker and the corresponding processing time Processing Time 1 Heat-stake lens to bezel 2. Inspect bezel 3. Clean switch holes 14 26 Install set switch in bezel Total time for A 18 68 23 5.Check switch travel 6.Clean inside bezel Preparation 2 25 60 7. Install module in bezel Total time for B 8. Install battery clip on module 9. Heat-stake battery clip on module 10. Install two batteries in module 1. Check switch Total time for C Battery Installation 20 70 12. Instal band 13. Inspect band Total time for D 45 13 58 Band Installation 4 Packaging Preparation 15. Final test Total time for E 65 16. Place watch and cuff in display box 7. Place cover in display box base 18·Place owner's manual and box into 20 14 30 Watch packaging Total time for F If an external supplier suggests shipping the battery module with preinstalled batteries, thereby eliminating the need for step 10, What is process capacity in clock per hour?

Explanation / Answer

Total Labor content is sum of all effective time at all the different steps: 68+60+70+58+65+64= 385 secs