Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

5. Assume that control signals are deasserted when 0 and asserted when 1. Consid

ID: 3921931 • Letter: 5

Question

5. Assume that control signals are deasserted when 0 and asserted when 1. Consider the items listed below

I. 9
II. 16
III. 32
IV. zero bits
V. pipeline bubble
VI. nop

a) (10) For each of the three blanks (1) through (3) within the following statement, select one of the above terms I through VI to fill-in the each blank ( a different item for each blank):

The assemble generates __(1)____ __(2)___ to create a __(3)_______.

b) (10) For each of the three blanks (1) through (3) within the following statement, select one of the above terms I through VI to fill-in the each blank ( a different item for each blank):

The control unit generates __(1)____ __(2)___ to create a __(3)_______.

Explanation / Answer

I) The Assemble generates 1) 16 (2) 32 to create (3) nop........

2) The Control Unit Generates (1) zero bits (2) 9 to create a (3) pipeline bubble

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote