Problem 1-09 (Algorithmic) Suppose the following is the mathematical model: Max
ID: 395490 • Letter: P
Question
Problem 1-09 (Algorithmic) Suppose the following is the mathematical model: Max 11x s.t. ax & 50 a is the number of hours required for each unit produced hours uired for where If vve have stochastic model in which the value of varies between 2 nd S ' e., a 2, 3, 4. or = 5)the possisle values for the number of hours required per unit, what is the optimai valu for x? If required round your answer to two declmal places. b. What problems does t this stochastic model causo? The input in the box below will not be graded, but may be reviewed and considered by your instructor.Explanation / Answer
Rejected
Rejected
Rejected
11 X is max for a= 2
11x = 275
X = 25.00 (Ans)
B.
With the stochastic model, there needs to be optimmization for both X and for value of a, hence the 2 way optimization.
X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25.00 26 a 2 obj func 11x 11 22 33 44 55 66 77 88 99 110 121 132 143 154 165 176 187 198 209 220 231 242 253 264 275.00 286 constraint 1 <=50 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50.00 52 Ans Rejected X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 16.67 17 a 3 obj func 11x 11 22 33 44 55 66 77 88 99 110 121 132 143 154 165 176 183.33 187 constraint 1 <=50 3 6 9 12 15 18 21 24 27 30 33 36 39 42 45 48 50 51 AnsRejected
X 1 2 3 4 5 6 7 8 9 10 11 12 12.50 13 a 4 obj func 11x 11 22 33 44 55 66 77 88 99 110 121 132 137.5 143 constraint 1 <=50 4 8 12 16 20 24 28 32 36 40 44 48 50 52 AnsRejected
X 1 2 3 4 5 6 7 8 9 10.00 11 a 5 obj func 11x 11 22 33 44 55 66 77 88 99 110.00 121 constraint 1 <=50 5 10 15 20 25 30 35 40 45 50.00 55 AnsRejected
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.