vi) The following must be considered in developing the test and measurement plan

ID: 425354 • Letter: V

Question

vi) The following must be considered in developing the test and measurement plans A. the test site to be used B. the test equipment required C. the test procedures to be followed D. the test personnel skills and/or training required E. all the above vii) The rate of return is A a measure of reliability B. a measure of maintainability C. a measure of profitability D. a measure of speed E. none of the above vili) The optimum service life of an asset is A. the time just before the asset fails B. the time at which the asset should be repaired C. the time at which the asset should be serviced D. the time which minimises the cost of the system over its service life E. the time which minimises the cost of the maintenance over its service life ix) In a set of activities required for completion of a project, the critical path is A. the shortest duration path through the activity-event network B. the longest duration path through the activity-event network C. the path through the activity-event network in which no activities can be expedited D. the path through the activity-event network in which a delay in any of the activities will delay project completion E. none of the above x) A person is not convicted of a crime, when in fact they were guility. This type of error is categorised as a A. type 1 error B. type 2 error C. true negative error D. false positive error E. unfortunate mistake

Explanation / Answer

vi) The correct choice is :- E

vii) The correct choice is C

Explanation : - Rate of return is a key measure of profitability that relates a firm's net profits to its sales.

viii) The correct choice is D

Explanation : - Optimum service life means useful life to the user through its period of greatest productivity at least cost.

ix) The correct choice is B

Explanation : - A critical path is the longest path time wise connecting the initial and final event.