In painting an automobile at the factory, the thickness of the color coat has a
ID: 3392260 • Letter: I
Question
In painting an automobile at the factory, the thickness of the color coat has a process mean of 1.00mm and a process std. dev of 0.07mm. 20 samples of 5 cars were tested, resulting in the mean paint thickness shown the data set. Construct the upper and lower control limits for the x-bar chart, using the given process parameters. Plot the data on the control chart. Is this process in control? Explain
Paint Thickness: Means of 20 Samples (n= 5)
Mils 0.996 0.960 1.016 1.017 1.001 0.988 1.006 1.073 1.032 1.021 0.984 1.019 0.997 1.024 1.033 1.030 0.994 0.980 0.977 1.037Explanation / Answer
In painting an automobile at the factory, the thickness of the color coat has a
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.