Need these problems done today as the assignment expires at midnight. Problem 1
ID: 403852 • Letter: N
Question
Need these problems done today as the assignment expires at midnight.
Problem 1 -
Loan Processing times are being monitored at a local company. Samples of six observations each have been taken, and the results are listed. Using Factors from Table 10.3, determine lower and upper control limits for a a mean chart
Sample Number 1 2 3 4 5
------------- 65 65 66 58 55
------------- 68 58 62 73 67
------------- 58 51 63 54 58
------------- 45 65 51 61 73
------------- 55 67 64 76 64
------------- 59 51 63 65 57
Loan Processing times are being monitored at a local company. Samples of ten observations each have been taken, and the results are listed. Using Factors from Table 10.2, determine lower and upper control limits for a a Range chart
Sample Number 1 2 3
------------- 58 65 59
------------- 50 49 45
------------- 63 58 50
------------- 69 64 64
------------- 66 45 62
------------- 52 52 53
------------- 45 45 50
------------- 58 60 51
------------- 50 48 59
------------- 53 53 50
39.425 , 83.041 51.269 , 71.197 50.329 , 72.137 52.209 , 70.257 None of the AboveExplanation / Answer
1)52.209 , 70.257
2)2.31 , 45.675