A manufacturing plant runs three shifts with no breakdowns and plenty of raw mat

ID: 404847 • Letter: A

Question

A manufacturing plant runs three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 9 tons per day since the third shift has devoted much of their time to preventive maintenance.   It is currently averaging a 75% utilization rate.  What is the capacity of the plant?

A) 0 to 9 tons

B) 10 to 12 tons

C) 13 to 16 tons

D) 17 to 20 tons

A manufacturing plant runs three shifts with no breakdowns and plenty of raw materials. Over the past week, the plant has produced an average of 9 tons per day since the third shift has devoted much of their time to preventive maintenance. It is currently averaging a 75% utilization rate. What is the capacity of the plant? A) 0 to 9 tons B) 10 to 12 tons C) 13 to 16 tons D) 17 to 20 tons

Explanation / Answer

B) 10 to 12 tons