THE PEACH COMPUTER COMPANY Donald Bright, supply manager at the Peach Computer C
ID: 414971 • Letter: T
Question
THE PEACH COMPUTER COMPANY
Donald Bright, supply manager at the Peach Computer Company, was preparing his notes for a meeting to be held that afternoon. The meeting concerned the construction of a new $6 million, 120,000-square-foot building to be located near Dayton, Ohio. The principle issue to be discussed, and hopefully resolved, was what method of specification the firm should use in the purchase of its new building. When the requirement for the building first arose, the plant engineer at Peach advocated the use of a design firm as the desired method of developing the specifications. Such firms were employed successfully by Peach on seven previous construction projects it had completed during the past five years. Under this approach, a design firm, traditionally referred to as an architectengineer or simply A-E, is retained to develop the detailed plans and specifications for the new building. These specifications are identical in concept to the materials and method-ofmanufacture specifications used in the manufacturing industry to purchase manufactured goods. After they are developed and approved, the construction plans and specifications in sequence become (1) the basis for solicitation of bid prices from qualified construction firms, (2) the cardinal part of the resulting construction contract, and (3) the standard against which inspections are performed. Don had conducted some preliminary discussions with members of the Dayton Institute for Supply Management regarding the cost for A-E services. He learned that the fees for local projects similar to his were averaging 8 percent of estimated construction cost. This percentage was in line with Peach’s experience on its own projects. One of the members of the Dayton chapter with whom Don talked suggested that he read an article in an issue of the California Management Review (CMR). The article, entitled “Inflation, Recession, and Your Building Dollar,” dealt with the purchase of building construction. Don learned that several alternative approaches to supplying building construction were available. One approach particularly appealed to him. It provided for the use of performance specifications. Such specifications, instead of describing the building item by item in terms of its physical properties, describe in words the building’s intended function, i.e., how large it must be; how well lighted, heated, and cooled it must be; its longevity; its operating costs; and so on. After the performance description is developed, it is used to solicit from qualified bidders a package proposal that includes (1) a design approach, (2) a firm agreed price, and (3) a guaranteed completion date. The CMR article documented that when properly used, performance specifications for buildings can result in a significant savings in both dollars and time. Additionally, the article data revealed that when this method is correctly used, a considerable savings in both the cost and the time required to complete the project is a reasonable expectation. Furthermore, the article indicated that the buyers of buildings purchased under this method have experienced approximately equal satisfaction with their buildings as those who used A-E’s. In preparation for the afternoon meeting, Don decided to develop lists of advantages and disadvantages for each of the two approaches he was considering. After an evaluation of both lists, Don expected to be able to make a formal recommendation as to which method he thought Peach should employ.
1. Should Don get any additional information? Explain.
2. Discuss the inherent advantages and disadvantages of using performance specifications.
3. Discuss the inherent advantages and disadvantages of the plans and specifications method of describing quality.
4. Assuming that Don’s investigation and analysis indicates that both methods are practical for use by Peach, discuss which approach Don should recommend.
5. Explain why one method will require more active involvement on Don’s part than the other approach.
Explanation / Answer
1) Yes, Don should get information about the cost involved in adopting performance specification method nad check on its reliabilty.
2) The advantages of using Performance specification is that it would save a lot of time and cost to the company, but the diasdvantage is that we cannot be sure of how reliable it would be, and also when wie use an AE, we may get his/her suggestions and ideas as well, which is not possible in case of performance specific method. And the contractors may keep bidding, and their priorities cannot be the same.
3)The advantage of plans and specifications method on quality is that it gives a clear picture on the actual and estimated values, where is the disadvantage is that we cannot finalize the data through this method. i.e., it cannot be accurate or modified.
4) Don should reccoment the A.E method since they have been used to this method for years. Also the performance spec method takes away the ability of the owner to decide.
5) One method will require more active involvement on Don's part than the other approach because in one method, the AE will take responsibility of the plan where is in the other method Don has to take care of the specifications and decide on the priorities of the specs.