The preinduction physical examination given by the U.S. Army involves the following seven activities:

a) The correct precedence relationship with the assignment of tasks to workstations that minimizes the cycle time is shown in ____below (where Par. 1, Par. 2, and Par. 3 represent the three paramedics and Doc. 1 and Doc. 2 represent the two doctors).

There are 5 workstations, three managed by the paramedics and the other two managed by the doctors. Given the 5 workstations, the least possible cycle time is____ minutes (enter your response as a whole number)

b) the number of people that can be processed using the assembly line in an hour___people (round to 2 decimal places)

c) The activity that is the current bottleneck is___

d) For the assembly line, the idle time per cycle=___minutes (enter as a whole number)

e) If an extra paramedic was available, the paramedic should be assigned to activity___to reduce cycle time

Explanation / Answer

A.

So cycle time for min is Fig 2 with 16 mins

Given the 5 workstations, the least possible cycle time is__16__ minutes

b) the number of people that can be processed using the assembly line in an hour___people (round to 2 decimal places) = 60/16 = 3.75

c) The activity that is the current bottleneck is E, as it takes 16 min.

d) For the assembly line, the idle time per cycle=__9 _minutes

e) If an extra paramedic was available, the paramedic should be assigned to activity__E_to reduce cycle time

As it is the bottleneck process.

Eng Block Processing time Flow in Flow out Fig 1 A 11 0 11 B 8 11 19 Par 1 19 Avg flow time 37 C 4 19 23 WIP 3.647887324 Completion/Makespan D 7 23 30 Par 2 11 Utilization 0.274131274 E 16 30 46 Par 3 16 F 13 46 59 Doc 1 13 G 12 59 71 Doc 2 12 Makespan 71 Completion 259 Eng Block Processing time Flow in Flow out Fig 2 A 11 0 11 C 4 11 15 Par 1 15 Avg flow time 36.42857143 B 8 15 23 WIP 3.591549296 Completion/Makespan D 7 23 30 Par 2 15 Utilization 0.278431373 E 16 30 46 Par 3 16 F 13 46 59 Doc 1 13 G 12 59 71 Doc 2 12 Makespan 71 Completion 255 Eng Block Processing time Flow in Flow out Fig 2 A 11 0 11 C 4 11 15 Avg flow time 36.42857143 B 8 15 23 Par 2 12 WIP 3.591549296 Completion/Makespan D 7 23 30 Par 1 30 Utilization 0.278431373 E 16 30 46 Par 3 16 F 13 46 59 Doc 1 13 G 12 59 71 Doc 2 12 Makespan 71 Completion 255