Construction project causes dust hazard in neighborhood: Propose a management pl

ID: 231937 • Letter: C

Question


Construction project causes dust hazard in neighborhood: Propose a management plan for improving the neighborhood’s environmental sustainability with respect to dust hazard caused by construction project. Document, evaluate, and propose a management plan to solve the issue. The paper (750 words) should include the following: 1. A description of the dust hazard issue caused by construction and how it impacts the neighboring community 2. Your observations and analysis of the steps taken to solve or mitigate the issue 3. An evaluation of the effectiveness of those steps 4. Improvements you would make to the current management plan or your own solution

Construction project causes dust hazard in neighborhood: Propose a management plan for improving the neighborhood’s environmental sustainability with respect to dust hazard caused by construction project. Document, evaluate, and propose a management plan to solve the issue. The paper (750 words) should include the following: 1. A description of the dust hazard issue caused by construction and how it impacts the neighboring community 2. Your observations and analysis of the steps taken to solve or mitigate the issue 3. An evaluation of the effectiveness of those steps 4. Improvements you would make to the current management plan or your own solution

Construction project causes dust hazard in neighborhood: Propose a management plan for improving the neighborhood’s environmental sustainability with respect to dust hazard caused by construction project. Document, evaluate, and propose a management plan to solve the issue. The paper (750 words) should include the following: 1. A description of the dust hazard issue caused by construction and how it impacts the neighboring community 2. Your observations and analysis of the steps taken to solve or mitigate the issue 3. An evaluation of the effectiveness of those steps 4. Improvements you would make to the current management plan or your own solution

Explanation / Answer

1) Dust can become airborne when soil is exposed or left uncovered. Wind then picks up the exposed soil and carries it off-site.Through this process dust spread around the construction side.

Airborne dust from construction sites is a problem for a number of reasons.

Such Points are given below :-

•create health problems, particularly for those with respiratory problems

•cause environmental degradation, including air and water pollution

cause eye,nose,throat irritation

•create problems with visibility

•damage or dirty property and belongings

•create unsafe working conditions

•increase costs associated with the loss of materials or additional work involved

2) The steps should be taken taken to solve or mitigate the issue is given below :-

i) Putting physical barriers

ii) Controlling the site traffice

iii) Engaging of water sprays

iv) Proper management of earth moving machineries

v) Limiting cleared areas

vi) Vegetative stabilisation

vii) Compaction of soil

viii) Chemical stabilisation

3) There are a number of benefits associated with effective dust control on

construction site, including:

To the Builder:

_ Enhanced business reputation

_ Better working conditions for staff

_ Better working relationships with clients and the community

_ Improvements in relations with regulatory authorities, eg. Local Government

To the Owner:

_ Reduced risk of damage to property

_ Improved relationships with future neighbours

_ Knowledge of contribution to environment protection

_ More attractive environment

To the Neighbours and Community:

_ Fewer disruptions to everyday living

_ Reduction of health risks resulting from air pollution

_ Reduced risk of damage to property and belongings

_ Less cleaning!

To the Environment:

_ Reduction in air pollution

_ Reduction in water pollution

_ Fewer disturbances to existing flora and fauna habitats

4) Beside the given steps my own additional solution to improve the current management plan is

As Climate is a main constraint to construction company, these things should be there in mind :-

i). To check weather reports daily; closely observe weather patterns to enable action to be taken immediately if conditions change

ii). Implement control measures that ensure dust problems do not occur while the site is unattended, eg. at night or weekends.

iii) .Adopt a site shut down and cover up policy during periods of extreme weather conditions, eg. high winds and low humidity. All site operations should cease and all exposed areas covered or treated to ensure dust does not become airborne.