Direct materials per liter Direct labor cost per liter Direct labor hours per li
ID: 2417963 • Letter: D
Question
Direct materials per liter Direct labor cost per liter Direct labor hours per liter Total direct labor hours CoolDay $0.40 $0.25 0.04 120,000 $1.20 S0.50 0.09 27,000 Expected Use of Cost Drivers per Product Expected Use of Cost Drivers Activity Cost Pools Cost Drivers Estimated Overhead CoolDay LiteMist Grape processing Aging Bottling and corking Labeling and boxing Maintain and inspect equipment Cart of grapes Total months Number of bottles Number of bottles Number of inspections $146,784 666,600 288,900 200,700 244,000 $1,546,984 6,600 6,000 600 6,600,000 3,000,000 3,600,000 900,000 600,000 300,000 300,000 450 600,000 350 900,000 800 Answer each of the following questions (a) and (b) (1) Under traditional product costing using direct labor hours, compute the total manufacturing cost per liter of both products. (Round answers to 3 decimal places, e.g. $12.250.) Manufacturing cost per liter (2) Under ABC, prepare a schedule showing the computation of the activity-based overhead rates. (Round overhead rates to 3 decimal places, eg. 12.250.) Activity Cost Pools of Cost Drivers Overhead Rates Grape processing Aging Bottling and corking Labeling and boxing Maintain and inspect equipment per cart per month per bottle per bottle per inspectionExplanation / Answer
(a)
Total direct labour hours = 120000 + 27000 = 147000
Total overhead cost = $1546984
Overhead allocation rate = $1546984 / 147000 hours = $10.524 per direct labour hours
Cost of production
Coolday
Litemist
Direct material
$ 0.40
$ 1.20
Direct labour cost
$ 0.25
$ 0.50
Manufacturing overhead
0.04 hours x $10.524/hour
$ 0.42
0.09 hour x $10524/hour
$ 0.95
Total manufacturing cost per litre
$ 1.07
$ 2.65
b)
activity cost pools
estimated overhead
expected use of cost drivers
activity based overhead rates
Grape Processing
$146784
6600
$22.24
per cart
Ageing
666600
6600000
0.101
Per month
Bottling and Corking
288900
900000
0.321
per bottle
Labelling and Boxing
200700
900000
0.223
per bottle
Maintain and Inspection equipment
244000
800
305
per inspection
$1546984
Cost of production
Coolday
Litemist
Direct material
$ 0.40
$ 1.20
Direct labour cost
$ 0.25
$ 0.50
Manufacturing overhead
0.04 hours x $10.524/hour
$ 0.42
0.09 hour x $10524/hour
$ 0.95
Total manufacturing cost per litre
$ 1.07
$ 2.65