Calculate Lead Time Michigan Machining Company machines metal parts for the auto
ID: 2489966 • Letter: C
Question
Calculate Lead Time Michigan Machining Company machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 80 parts. A part requires 4 minutes in milling and 6 minutes in finishing. The move time between the two operations for a complete batch is 7 minutes. Under the lean manufacturing philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 4 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place. Value-added time min min Non-value-added time min min Total lead time min min Value-added ratio (as a percent) % %Explanation / Answer
Value Added Time- It is the time in which actual value is added to the product or the value of process which a customer is willing to pay. example-production time
Non-value added time- The time spent on process which does not add any value to the product, such as move time, inspection time.
Lead Time- It is also Known as Throuput time or Turnaround time, which means total time spent on a product from start to finish, such as process time+ wait time+movement time.
1.Traditional Philisophy=
-Value added time-Process time of milling+ process time of finishing
4Mins*80parts+6Mins*80parts
320+480=800Mins
-Non Value Added Time=Movement time
7Minustes
-Value Added Ratio=Value Added Time/Value Added Time+Non-Value Added Time*100
800/800+7*100
99.13%
-Lead time=Total of Process time and movement time
800+7
807Minutes
2.Lean Philisophy
-Value Added Time= Process time of Miller+Process time of Finishing
4Minutes*4Parts+6Minutes*4Parts
16+24=40Minutes
-Non-Vlaue Added Time=Nil( As no Movement Time is Spent)
-Value Added Rati=Value Added Time/Value Added Time+Non Value Added Time*100
40/40+0*100
100%
Lead Time-40Minutes + 0
40Minutes