Calculate Lead Time Michigan Machining Company machines metal parts for the auto

ID: 2490124 • Letter: C

Question

Calculate Lead Time Michigan Machining Company machines metal parts for the automotive industry. Under the traditional manufacturing approach, the parts are machined through two processes: milling and finishing. Parts are produced in batch sizes of 75 parts. A part requires 5 minutes in milling and 7 minutes in finishing. The move time between the two operations for a complete batch is 8 minutes. Under the lean manufacturing philosophy, the part is produced in a cell that includes both the milling and finishing operations. The operating time is unchanged; however, the batch size is reduced to 3 parts and the move time is eliminated. Determine the value-added, non-value-added, and total lead times, and the value-added ratio under the traditional and lean manufacturing methods. If required, round percentages to one decimal place.

Check my wpork suggested:

Recall that lead time can be classified as one of the following:
1. Value-added lead time, which is the time spent in converting raw materials into a finished unit of product
2. Non-value-added lead time, which is the time spent while the unit of product is waiting to enter the next production process or is moved from one process to another
In this exercise for Traditional:
Value-added processing time = Milling time + Finishing time
Non-value-added time = Total within-batch wait time + Move time, where Total Within-Batch Wait Time = (Total Time to Perform Operations) x (Batch Size - 1)
Add value-added processing time + non-value-added processing time to obtain total processing time.
Calculate Value-Added Ratio = Value-Added Process Time ÷ Total Process Time
In this exercise for Lean Manufacturing:
Value-added processing time = Milling time + Finishing time
Non-value-added time = Total within-batch wait time, where Total Within-Batch Wait Time is obtained by multiplying the process time by the remaining units in the batch (waiting their turn):
There is no move time.
Add value-added processing time + non-value-added processing time to obtain total processing time.
Calculate Value-Added Ratio = Value-Added Process Time ÷ Total Process Time

Traditional Philosophy    Lean Manufacturing Philosophy Value-added time min min Non-value-added time min min Total lead time 908 min min Value-added ratio (as a percent) % %

Explanation / Answer

In this exercise for Traditional:

Value Added Processing Time = Milling time + Finishing time

= 5min + 7min = 12min

Total within batch wait time = Total Time to Perform Operations * (Batch Size - 1)

= 12min*(75-1) = 888min

Non Value Added Processing Time = Total within batch wait time + Move time

= 888min + 8min = 896min

Total Processing Time = value-added processing time + non-value-added processing time

= 12min + 896min = 908min

Value-Added Ratio = Value-Added Process Time ÷ Total Process Time

= 900min/908min = 0.0132

In this exercise for Lean Manufacturing:

Value Added Time = 5min+7min = 12min

Non Value Added Time = 12*(3-1) = 24min

Total Process Time = 12min+24min = 36min

Value Added Ratio = 12/36 = 0.3333