Con ect wcbute Login Connect mi?sRege true&returnUri;_ https%3AS2 Fur nt Problem
ID: 2567182 • Letter: C
Question
Con ect wcbute Login Connect mi?sRege true&returnUri;_ https%3AS2 Fur nt Problem 11-14 Measures of Internal Business Process Performance [L011-3] DataSpan, Inc, automated its plant at the start of has gathered data relating to these measures for the first four months of operations the current year and installed a flexible manufacturing system. The company is also measurement. After much study, the company has decided to use the performance measures below, and it encountered, including problems evaluating its suppliers and moving toward Lean Production. Many adjustment problems have been relating to performance Delivery cycle tise (eays) Manufacturing cycle effielency (NCE) Percentage of on-time deliveries Total sales (units) 1372 1871 1800 Management has asked for your heip in computing throughput time, delivery cycle time, and MCE The following average times have been logged over the last four months es Process tise per unit 2.8.7 25 Required 1-a Compute the throughput time for each month Compute the delivery cycle time for each month 1c Compute t the manufacturing cycle efficiency (MCE) for each month the company's performance over the last four me, and so forth, given for month 4. Assume that in month 5 the move time process time, and so 3-a Refer to the move time, process forth, are the same as in month queue time during peoduction Compute the new throughput time and MCE 4, except that through the use of Lean Production the company ts able to completely eliminate the e move time, process time, and so forth, given for morith 4 Assume an month 6 that the move time, process sme, and so the same as in month 4 except t hat the company is able to completely eliminate both the queue time during forth, are again production and the inspection sime. Compute the new throughout sme and MCE Complete this question by entering your answers in the tabs Requred 2 DOLLExplanation / Answer
ans 1-a,1-b,1-c Month 1 2 3 4 Throughput time (days) 8.8 9 9.6 9.9 Delivery cycle time (days) 31.8 34.2 37.6 40.2 Manufacturing cycle efficiency (MCE) 9.4 8.2 7.2 6.2 % Percentage of on-time deliveries 92% 87% 84% 81% Total sales (units) 2060 1972 1,871 1,800 Average per Month (in days) 1 2 3 4 Move time per unit M 0.7 0.4 0.5 0.5 Process time per unit P 3 2.8 2.7 2.5 Wait time per order before start W 23 25.2 28 30.3 of production Queue time per unit Q 4.2 4.7 5.3 6 Inspection time per unit I 0.9 1.1 1.1 0.9 Throughpit Time T= (P+I+M+Q) 8.8 9 9.6 9.9 Delivery Cycle (W+T) 31.8 34.2 37.6 40.2 Manufacturing Cycle efficiency P/T*100 9.4 8.2 7.2 6.2 ans 2 There is decrease in MCE, increase in delivery cycle and throughput time which shows that the company performance has been decreased Average per Month (in days) 5 Move time per unit M 0.5 Process time per unit P 2.5 Wait time per order before start W 30.3 of production Queue time per unit Q 0 Inspection time per unit I 0.9 Throughput Time T= (P+I+M+Q) 3.9 Delivery Cycle (W+T) 34.2 Manufacturing Cycle efficiency P/T*100 7.3 ans 3 Manufacturing Cycle efficiency P/T*100 5 month 7.3 % ans 3b Average per Month (in days) 6 Move time per unit M 0.5 Process time per unit P 2.5 Wait time per order before start W 30.3 of production Queue time per unit Q 0 Inspection time per unit I 0 Throughput Time T= (P+I+M+Q) 3 Delivery Cycle (W+T) 33.3 ans 3b Manufacturing Cycle efficiency P/T*100 7.5 ans 3b
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.