Company uses a volume-based costing system that applies overhead cost based on m
ID: 2597207 • Letter: C
Question
Company uses a volume-based costing system that applies overhead cost based on machine hours at $20 per machine hour. The company is considering adopting an activity-based costing system with the following data Cost Driver Rate $1.50 1.00 8.00 0.40 15.00 Materials handling Lathe work Pounds of material Number of parts Number of machine hours Number of turns Number of units tested Grinding Testing The two jobs processed in the month of May had the following characteristics: Job A Job B Direct material Direct labor Pounds of material Number of parts Number of turns Number of machine hours Number of units in each job 18,000 $ 60,000 6,000 $ 12,000 900 3,000 450 1,500 0,000 40,000 375 800 80 200 All units tested 1. Using ABC, the cost per unit for Job A is $325.90 b. $125.00 c $425.00 d. $300.00 -2. Using ABC, the cost per unit for Job B is: a. $157.00 b. $385.90 C. $360.00 d. $517.00 3. The difference in total cost between ABC and the volume-based costing system for Job A is: a. $18,400 C. d. $425 $2,500 $15,400Explanation / Answer
1) Answer (C) $425
Calculation :
The cost per unit for Job A = ($18,000 + $6,000 + (900*1.50) + (450*1) + (10,000*0.40) + (375*8) + (80*15)) / 80
= $34,000 / 80
= $425
2) Answer (D) $517
Calculation :
The cost per unit for Job B = ($60,000 +$12,000 + (3,000*1.5) + (1,500*1) + (40,000*0.40) + (800*8) +(200*15))/200
= $103,400 / 200
= $517
3) Answer (C) $2,500
Calculation :
Cost for Job A as per volume based system = 18,000 + 6,000 + (375 * 20)
= 31,500
Cost of Job A as per ABC = $34,000
Difference = $34,000 - $31,500
= $2,500
Related Questions
Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.