Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

At a dock, a crane lifts a 2094 kg container 14 m, swings it out over the deck o

ID: 3897941 • Letter: A

Question

At a dock, a crane lifts a 2094 kg container 14 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 9 m below the level of the dock.The acceleration of gravity is 9.81 m/s2. Neglect friction losses. How much work is done by the crane on the container? Answer in units of kJ At a dock, a crane lifts a 2094 kg container 14 m, swings it out over the deck of a freighter, and lowers the container into the hold of the freighter, which is 9 m below the level of the dock.The acceleration of gravity is 9.81 m/s2. Neglect friction losses. How much work is done by the crane on the container? Answer in units of kJ

Explanation / Answer

Work done = -(3167*(10-6))*9.81 = -124.273 KJ

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote