Consider a production system that consists of a single station with a production
ID: 402081 • Letter: C
Question
Consider a production system that consists of a single station with a production rate of 1 part per minute and a process variability given by Ce=1.
a) suppose the system is run as a push line with release rate of .9 parts per minute and Ca=1. Use the VUT equation to compute the average cycle time and the average number of parts in the system. Then calculate what happens to the average cycle time and number of parts in the system if process variability is eliminated so that Ce=0
b) Now suppose the system is run as a CONWIP line with WIP level of 1 job and has original variability levels Ce=Ca=1. What is the average throughput rate and cycle time? what happens to throughput and cycle time if we eliminate process variability of Ce=0?
Explanation / Answer
please increase time i know the solution i can give you yhe solution
Related Questions
drjack9650@gmail.com
Navigate
Integrity-first tutoring: explanations and feedback only — we do not complete graded work. Learn more.