Academic Integrity: tutoring, explanations, and feedback — we don’t complete graded work or submit on a student’s behalf.

Construction project managment: QUESTION 21 The ____ is responsible for tool sec

ID: 1711056 • Letter: C

Question

Construction project managment:

QUESTION 21

The ____ is responsible for tool security.

subcontractor

foreman

apprentice

field engineer

QUESTION 22

The three primary elements of a construction project are cost, ____, and quality.

quantity

time

planning

identification

QUESTION 23

Overall, ____ accounts for the least percentage of construction waste.

rocks

gypsum board

metal

concrete

QUESTION 24

The number one existing building problem and insurance industry concern of the past 10 years has been ____.

wind damage

water damage

mold

frame instability

QUESTION 25

____ software allows a single server to host a software application and then allows multiple sites to access it.

Word processing

Application-serving

BIM

Database

Explanation / Answer

21 Foreman

22 Time(All these three elements are independent each other)

23 Gypsum board

24 Mold (Air quality issue accumulation of mold due to moisture trapped in the building)

25 Application-serving (Means multiple sites have a continuous access all at the same time)

Hire Me For All Your Tutoring Needs
Integrity-first tutoring: clear explanations, guidance, and feedback.
Drop an Email at
drjack9650@gmail.com
Chat Now And Get Quote